|
Fiscal Impact |
|
Fiscal Impact: |
The FY 2019 Capital Projects Fund Budget allocates $200,000 for repair to the Wildwood Valley Bridge. Until construction costs are obtained through a formal bid letting, it is difficult to forecast how much this work will actually cost. The design costs are approximately 20% of the budget, which is a little higher than originally projected. However, we believe the cost provided by Alfred Benesch & Company to be fair for the proposed work. |
|