Print Back to Calendar Return
 
2.
         
BRENTWOOD PLANNING COMMISSION
Meeting Date: 01/04/2021  

Information
PROJECT NUMBER
BPC2012-004        
PROJECT DESCRIPTION
Minor Site Plan Alteration – The Academy at Holly Tree Gap, 1384 Holly Tree Gap Road

SEC, Inc. requests approval of minor revisions to the previously approved site plan that increases the proposed building height.  The proposed changes include:
  1. Removing the previously approval HVAC screen and raising the Parapet tp screen the rooftop mechanical units on the north and south elevations;
  2. Decreases the building height from 32' 4" and 25' 8" to 29' 9" 23' 6" respectively;
  3. Replaces the previously approved fiber cement trim around the windows with Aluminum Cladding and aluminum storefront window system with colored glass on the north and south elevations;
  4. Decreased the building height from 24' and 32' 4" to 22' 2" and 30' 1 1/4" respectively on the east elevation, and
  5. Replaces the previously approved fiber cement trim around the windows with Aluminum Cladding and aluminum storefront window system with colored glass on the east and west elevations.
ZONING OF PROPERTY
Zoning C-2
APPLICANT NAME/ADDRESS
Mr. Aws Ahmed, SEC, Inc., 850 Middle Tennessee Blvd, Murfreesboro, TN 37129
Attachments
Final Staff Report
Vicinity Map
Proposed Elevation Changes
Color Elevations
Existing Conditions
Proposed Site Plan
Initial EPSC Plan
Drainage Grading & Final EPSC Plan
Fire Truck Turning Plan
Landscape Plan
Parking Lot Island Plan
Photometric Plan
Roadway Improvements

AgendaQuick©2005 - 2024 Destiny Software Inc., All Rights Reserved